Issue Description Coutry Z, one hop of Microwave link interconnected by RTN 950 (V1R3), DCN adopts the Inband IP soultion. […]
Summary: When an OptiX PTN 950 NE is configured with two system control boards (active and standby), the license modules on the system control boards accumulate the board debugging information. The accumulated debugging information exhausts the space of the flash memory, leading to a failure to save the configuration data and back up the NE database. Product Family: PTN                           […]
Product Line: Carrier IP product line                 Product Family: PTN Summary: When an OptiX PTN 950 NE is configured with two system control boards (active and standby),the license modules on the system control boards accumulate the board debugging information. The accumulated debugging information exhausts the space of the flash memory, leading to a failure to save the configuration dataand back up the NE database.   [Problem Description] Trigger conditions: The OptiX PTN 950 NE uses two system control boards which run the V100R002C01SPC100 NE software. Symptom: The standby system control board exhausts the flash memory space at a speed two times faster than the active system control board. Therefore, the fault first occurs on the standby system control board. During the periodical backup of the NE database, if the flash memory has insufficient free space, the system control board reports a DBMS_ERROR alarm. And also lead to memory leaks, if the memory leak reaches the threshold, then reported MEM_OVER alarm. […]